It is very easy, the most important step is to contact us and talk to us about the project you have in mind, specify what size and what technology the mirrors are and if it is required with a screen and it is very important to share with us what location it would be for.
At NAALA we have been requested for several projects, the most recent is in a box at the Azteca Stadium where mirrors helped with the interior design of the box, as seen in the image
HOW DO I START THIS PROJECT?
The client contacted us through WhatsApp, there he sent us the specifications of how he wanted his mirrors and with what technology, a formal quote was made and sent to him, then he continued with a visit to the store where we have the display mirrors and Right there, the type of technology that the mirrors come with was explained to him and he was given more detailed information and he also explained to us how he required the mirrors.
WHAT IS THE DELIVERY TIME?
The delivery time for these projects where several mirrors are required is 3 to 4 weeks manufacturing time.
WHAT IS REQUIRED AFTER THE QUOTE?
After the quote, a first payment of 50% in advance and 50% upon delivery or 100% is required depending on the project and the number of mirrors required.
WHAT WAS WHAT THE CUSTOMER ASKED FOR?
The customer requested a large mirror with two screens.
He also asked for mirrors on the ceiling.
He also asked for a large mirror with a single screen.
HOW WAS THE INSTALLATION ON THE CEILING?
Installation on the ceiling was something we had never done, but nothing is
impossible so we looked for a way to install it.
Comments